Sunday 3 August 2008

3rd August 2008 - Right Horizontal Stabiliser

Completed the bit I forgot on the right elevator by welding in place the positioning pieces that locate the hinges. Then cut and welded 3/4" lengths of 5/16*0.058 tubing onto what will be the right horizontal stabiliser (HS) rear spar. The hinges screw through these using AN3 bolts. This will allow me to get perfect continuity between the HS and the elevator as I build the framework of the HS on the building board.
Posted by Picasa