Monday, 29 September 2014

30th August 2014 - Baffled by baffles: day 3

Day 3 of the baffle construction saw the basic structure completed. The left front baffle was completed and the centre section of the right front baffle extended. Balanced on the top of cylinder 1 you can see the spacer I "printed" to fit on a Sharpie pen which I used to mark a cut line around the top of the baffle to provide the 1/2" clearance to the cowl.