Sunday 23 March 2008

The Supplies finally arrive

Friday 7th March 2008 and the main supplies finally arrive. The main tubing came in a 24ft long package which required the shipper to use his largest lorry to deliver. Here I am starting to unpack the tubing and stowing it below the work bench. The longest pieces of tubing had to be cut to fit in the workshop which is only 20ft long so study of the plans was required to make sure that cuts were made without wasting material or ending up without long enough lengths for key components