Friday 6 August 2010

6th August 2010 - Wingtip frames complete

Today I pinned, screwed, and glued the second wingtip frame together. Next job is to fit gussets to strengthen all the joints in the two wingtips and fit spar caps to the main spars and stub rear spars. Then it's back to sanding!
Posted by Picasa