Thursday 26 March 2009

25th March 2009 - The List!

My major objective over the next few weeks is to get the fuselage finished to the stage of being ready for priming prior to covering. This means getting all the fixings that will be needed welded or brazed into place so that the painting doesn't have to be re-done as bits are added. To this end I've prepared a "to-do" list of the jobs to be completed. Some of them are quick and easy, others will take significantly more time to complete (poor project management practice I know) but getting everything down in a list should help in avoiding missing too much. So steps needed as of today (I'm sure more will be added) are:

  1. Weld in place left forward sections of fuselage side stringers (1/2” * 0.035” 4130 tube)
  2. Weld in place left mount tubes for rear sections of fuselage stringers
  3. Braze in place left stringer supports
  4. Match drill left stringers to supports
  5. Weld in place right forward sections of fuselage side stringers (1/2” * 0.035” 4130 tube)
  6. Weld in place right mount tubes for rear sections of fuselage stringers
  7. Braze in place right stringer supports
  8. Match drill right stringers to supports
  9. Fabricate right window mounting angles
  10. Fabricate right front window
  11. Fabricate right fuselage cheek panel
  12. Fabricate left seat outer filler panel and install mount tabs
  13. Fabricate right seat outer filler panel and install mount tabs
  14. Fabricate left rear window surround and install mount tabs
  15. Fabricate right rear window surround and install mount tabs
  16. Fabricate left rear window
  17. Fabricate right rear window
  18. Order tubing to fabricate engine mount
  19. Fabricate engine mount
  20. Fabricate left above door panel and install mount tabs
  21. Fabricate right above door panel and install mount tabs
  22. Fabricate left window to main screen angle
  23. Fabricate right window to main screen angle
  24. Fabricate left above-door panel to main screen angle
  25. Fabricate right above-door panel to main screen angle
  26. Fabricate and install left strut fuselage mount
  27. Fabricate and install right strut fuselage mount
  28. Cut antenna mount panel to final size
  29. Install baggage compartment mount tabs
  30. Purchase baggage compartment panelling
  31. Fabricate baggage compartment angles
  32. Fabricate baggage compartment walls and floor
  33. Fabricate and install rudder hinge fabric support plates
  34. Fabricate and install left elevator hinge fabric support plates
  35. Fabricate and install right elevator hinge fabric support plates
  36. Fabricate windscreen to firewall seal angle
  37. Fabricate left door panelling
  38. Install left door window support tabs
  39. Fabricate left door window
  40. Fabricate right door panelling
  41. Install right door window support tabs
  42. Fabricate right door window
  43. Install cable support tabs - panel to autopilot servo
  44. Install cable support tabs - panel to strobe pack
  45. Install cable support tabs - strobe pack to left wing root
  46. Install cable support tabs - strobe pack to right wing root
  47. Install cable support tabs - panel to antenna
  48. Install cable support tabs – panel to control column
  49. Install cable support tabs - panel to front underside panel for transponder antenna
  50. Install cable support tabs - strobe pack to rear of vertical stabiliser
  51. Fabricate and install mounts for flexible brake pipe terminations
  52. Fabricate and install rear battery mount (option for forward CofG)
  53. Fabricate and install firewall battery mount (option for rearward CofG)
  54. Install cable support tabs – firewall forward to rear battery mount
  55. Fabricate and install leg intersection fairing mount tabs
  56. Fabricate co-pilot control column extension
  57. Fabricate and install VOR antenna mount in vertical stabiliser
  58. Close rudder front spar tubing top and bottom
  59. Install pitot tubing support mounts
  60. Install static tubing support mounts
  61. Install static port plates
  62. Fabricate and install rear left seat belt mounts
  63. Fabricate and install front left seat belt mounts
  64. Fabricate and install rear right seat belt mounts
  65. Fabricate and install front right seat belt mounts
  66. Redo left front window
  67. Fabricate left internal above door panel
  68. Fabricate right internal above door panel
  69. Rework undercarriage mount to level fuselage
  70. Fabricate and install rear spar carry through cover
  71. Fabricate left rear window sill and fuselage diagonal cover
  72. Fabricate right rear window sill and fuselage diagonal cover
  73. Redo between seat fill panel and tabs
  74. Space door latches off door frames by an additional 1/8"
  75. Redo upper fuel tank straps
  76. Check all tabs are drilled to final size and install all missing nutplates
  77. Install mounts for tank breather line
  78. Install mount for transponder antenna
  79. Install support for firewall mounted gascolator
  80. Install support for firewall mounted tranducer manifold
  81. Install support for firewall mounted master and starter relays
  82. Install support for firewall mounted brake reservoir
  83. Install support for firewall mounted cabin heat valve
  84. Install support for firewall mounted electric fuel pump
  85. Fabricate shoulder seat belt attach cables
  86. Cut out side panels and flap lever cover to clear seat belts
  87. Fabricate and install shoulder seat belt attach cable support through baggage compartment rear bulkhead
  88. Drill firewall for throttle control
  89. Drill firewall for mixture control
  90. Drill firewall for carb heat control
  91. Drill firewall for power cabling
  92. Drill firewall for sensor and transducer cabling
  93. Drill firewall for cabin heat control
  94. Drill firewall for primer pipes
  95. Install support for firewall mounted vacuum regulator
  96. Install support for firewall mounted fusible link mounting

And that's all there is to it!

Update 27th March 2009, added 59,60,61 completed 1,2,3,4

Update 28th March 2009, completed 33,34,35,58

Update 30th March, completed 5,6,7,8, added 62,63,64,65

Update 31st March, completed 10, 22, 23

Update 1st April, completed 24,36

Update 3rd April, completed 9,11,20,21,25,28

Update 11th April, completed 18

Update 13th April, completed 37

Update 14th April, completed 14,16,39, added 66, N/A 38,41,57

Update 18th April, completed 61

Update 20th April, completed 69, added 67, 68, 69

Update 21st April, completed 15, 17

Update 23rd April, completed 19

Update 24th April, completed 62,63,64,65

Update 28th April, completed 12, added 70

Update 7th May, completed 67

Update 10th May, completed 29, 31, 70, 71, added 71, 72

Update 11th May, completed 13, 68, 72, added 73

Update 12th May, completed 40, 42, 66, added 74

Update 14th May, completed 26, 27, added 75, 76

Update 15th May, added 77

Update 16th May, completed 51,75

Update 17th May, completed 43, 44, 45, 46, 47, 48, 49, 50, 59, 60, N/A 52, 54, deferred 30, 32

Update 18th May, completed 77, 78, added 78

Update 25th May, completed 73, 85, added 79-94

Update 30th May, completed 74, 76, 86, 87

Update 16th July, completed 32, added 95, 96

Update 21st July, completed 82, 83, 88, 89, 90, 91, 92, 94, N/A 55, 93

Update 22nd July, completed 53, 80, 81, 96

Update 24th July, completed 79, 84, 95, deferred 56