Saturday, 22 November 2008

22nd November 2008 - Fuselage bottom complete

I started today by final welding the remaining bottom stringer stand-offs. Then all the stringer supports were drilled with a 1/8" drill. The stringers were positioned and cut to length before being match drilled to the supports. As can be seen in the picture these form a nice smooth curve ready to take the fabric. Next the firewall was replaced on the engine mount bolts and the lower part of the firewall was match drilled to it's mounting tabs. A sheet of 0.025" thick 6061-T6 aluminium was then match drilled to the bottom lip of the firewall. The positions of the bends to fit the shape of the stringer support bridge were marked and the sheet bent as can be seen in the picture. The position of the side bends were then also marked and the sheet bent up on each side and cut off just above the lower side mounting tabs. The sides were then match drilled to these tabs. The aluminium side cheeks will overlap the bottom sheet and attach to the same tabs providing a waterproof joint.
Posted by Picasa