6th August 2010 - Wingtip frames complete
Today I pinned, screwed, and glued the second wingtip frame together. Next job is to fit gussets to strengthen all the joints in the two wingtips and fit spar caps to the main spars and stub rear spars. Then it's back to sanding!
Newer Post
Older Post
Home
Total Pageviews
Blog Archive
►
2016
(8)
►
July
(2)
►
June
(6)
►
2015
(4)
►
April
(4)
►
2014
(26)
►
November
(3)
►
October
(10)
►
September
(6)
►
August
(7)
►
2013
(20)
►
November
(1)
►
October
(1)
►
September
(12)
►
August
(2)
►
January
(4)
►
2012
(9)
►
December
(6)
►
April
(1)
►
March
(2)
►
2011
(46)
►
November
(4)
►
October
(17)
►
September
(11)
►
August
(7)
►
March
(1)
►
February
(3)
►
January
(3)
▼
2010
(28)
►
September
(3)
▼
August
(4)
17th August 2010 - The propeller arrives
12th August 2010 - Wing structure complete
8th August 2010 - Wingtip spar caps and gussets
6th August 2010 - Wingtip frames complete
►
July
(4)
►
June
(1)
►
May
(1)
►
April
(13)
►
March
(2)
►
2009
(77)
►
November
(3)
►
October
(3)
►
September
(9)
►
August
(8)
►
July
(10)
►
May
(15)
►
April
(14)
►
March
(9)
►
February
(4)
►
January
(2)
►
2008
(110)
►
November
(8)
►
October
(13)
►
September
(6)
►
August
(21)
►
July
(16)
►
May
(4)
►
April
(13)
►
March
(29)
Contributors
Peter Mather
Unknown
Tailwind Links
Craig Laporte's build site
Tailwind locations
Tailwind main gear and tailspring supplier
Dan and Daniel Hedges' build site
Frank's build site
Tailwind components from Earl Luce
Carbon fibre components from Brian Alley
Chuck Gantzer's build site
Earl Trimble's build site
Yahoo Tailwind Forum