Monday, 3 October 2011

3rd October 2011 - The last priming?

The weather was good today so I got the last bits and pieces primed with the epoxy primer. This included the ailerons , flaps, rudder connection tabs, and spinner.
The spinner is a spun aluminium construction so has numerous rings of concentric surface texture. Once the basic primer coat was dry I applied numerous coats of a high build primer, sanding between each coat, to slowly bring the surface up to a smooth level. Tomorrow the paint from Stewart should arrive so I will have a first go at painting the spinner to a final colour.
Posted by Picasa

Sunday, 2 October 2011

2nd October 2011 - Fuselage covering complete

Over the last few days I've been adding the finishing tapes to the fuselage. The rivets for the top surface arrived in the post yesterday so they were inserted and the finishing tapes stuck in place over them. Then the finishing tapes along the join between the fuselage sides and bottom were applied. This was fairly messy laying on the ground and gluing over my head - the glue doesn't wash out of your hair but you can pick it off bit by bit. Finally the tape over the rudder post was applied.
The other little job completed was the bit of rework on the counterbalance on the left aileron. This was slightly out of alignment with the aileron and would have stood proud above the wing surface with the aileron in neutral position. So this was cut off the aileron spar and re-welded in the correct position.
Next job is to prime the aileron and flaps ready for covering them. The weather in the UK should be good for another couple of days so hopefully I will be able to get this done soon.
Posted by Picasa

Thursday, 29 September 2011

29th September 2011 - Rivet holes and more tapes

The stringers along the top of the fuselage need drilling for the pop rivets which will keep the fabric attached. I'm using 48" lines of rivets at 2" spacing on the outer stringers and 54" of rivets at 2" spacing along the centre stringer as per advice from Jim Clement. So the challenge was to drill 70+ holes in the centre of the circular stringers accurately spaced out without the drill bit wandering off centre and wrecking the fabric! After a bit of thought I decided to make a jig which would align the drill along the centre of the stringer and provide the spacing. I used a semi-circular router bit in the CNC router to machine a shallow channel in a bit of scrap aluminium. Then the router bit was exchanged for a 1/8" drill bit and the router programmed to drill two holes exactly 2" apart in the centre of the channel. The channel accurately located the jig over the stringers. Once the first hole was drilled in a stringer a spare drill bit was inserted through the jig into the ready drilled hole and then the second hole drilled through the other hole in the jig. Then it was just a case of moving the jig one space, with the spare drill bit popped into each new hole in turn and drilling through the other hole. It took about 30 minutes to make the jig and less than 10 to then drill the holes. I also then applied the finishing tapes over the bottom stringers and those on the left side of the aircraft. I now need to wait for the rivets to arrive from ACS before I can finish up the top of the fuselage and also still need to do the finishing tapes along the bottom longerons. I've also run out of 2" finishing tape which I need to complete the horizontal stabilisers and will also need for the elevators, flaps and ailerons so an order went in for another 50yds of that as well.


Posted by Picasa

27th September 2011 - Tapes

The next few days are going to be spent applying finishing tapes to the fuselage and vertical and horizontal stabilisers. I'm following to Stewart manual and videos precisely. Rib tapes are stuck at one end and the glue allowed to dry to a reasonably strong bond. Then the glue is applied along the rib until just before the other end. All excess glue is wiped off with a paper towel. The tape is pulled tight to cause it to conform to the shape of the covering and the glue again allowed to dry. Finally, the tapes are cut to length and the end glued. The joints between the fuselage sides and top and bottom will be reinforced with 3" finishing tape. In this case the tape is folded in half to get a centre line. The centre of the longeron is painted with a glue line which is allowed to get tacky. Then the tape can be positioned accurately over the longeron centre. The glueline is ironed to thermal soften the glue and bond the centre of the tape in place. Next the tape ironed flat against the top and side. Finally the edges of the tape are lifted and glue appled about a foot at a time with the excess wiped off. So far I've got the tapes completed for the vertical stabiliser, the top fuselage side joints, the right fuselage side stringers, and the horizontal stabiliser ribs. I've also applied the reinforcing tapes along the top stringers ready for the fabric attach rivets.


Posted by Picasa

Monday, 26 September 2011

26th September 2011 - Rib Stitching

I needed to rib stitch the vertical stabiliser before I could apply the finishing tapes to it and the rest of the fuselage and I had also only got the covering of the horizontal stabilisers to the point of being stitched so that was the task for today. One of the tedious but exacting jobs in rib stitching is marking out and making the holes for the stitches. In order to speed this up I spent some time making a jig. I used the CNC router to create a pattern of holes spaced 1-1/2" apart lengthwise and 1/2" apart side to side in a piece of aluminium strip. Some additional holes were also drilled in the middle of the strip. The centre point of a rib was then marked on the stabiliser in a couple of places and these were lined up in the middle holes in the jig. Then I used a fine taper bit on the soldering iron to make holes for the stitches through the parallel rows of jig holes. The net result was a perfectly straight line of evenly spaced holes along the rib. Then it was a case of putting the stitches in. Luckily I had videoed the demo done in the fabric covering course I'd done so after a quick refresher I completed the stitching of the two horizontal stabilisers and the vertical stabiliser. Rotating the horizontal stabilisers on the spar carry through made it easy to work on them. This leaves just the elevators to be stitched but I need to do the basic covering of these first.

Posted by Picasa

Saturday, 24 September 2011

24th September 2011 - Right fuselage side covered

I attached the fabric on the right side of the fuselage today so the basic box is now covered. The fabric over the windows on both sides was cut out using a soldering iron which seals the edge of the fabric and cuts accurately along the line of the window opening. In addition it was used to pierce all the holes for the screws to attach the window to the frame. You can also see round the inside of the left window frame the black self adhesive neoprene strip which will create a watertight seal with the glazing. It is a bit scary having a hot soldering iron near the pristine fabric - one slip....
However, all went well so next job on the covering is to apply all the tapes to cover the seams and protect the fabric where it lies on the stringers.
The rear shot show the upright vertical stabiliser as viewed from the rear; contrast yesterday's photo.

Posted by Picasa

23rd September 2011 - Top and left side covered

I've put in two very full days of work on the covering and have made good progress . First the inspection rings were glued into the Vertical stabiliser (VS) and floor. These are first attached to the inside of the fabric and then a patch 1" greater in radius in glued over the top, also on the inside. Finally the centre section will be cut out and the removable panel installed.
Next the right side of the VS was covered and the reinforcement tapes glued along the ribs ready for the rib stitching. The top of the fuselage was then covered. The tricky bit is getting the junction between the VS and the top skin. The top fabric was wrapped round the bottom tubes of the VS and into the VS itself. Then a finishing tape was applied to the outside to reinforce the joint.
Finally the left side was stuck in place. This has a cut out for the horizontal stabiliser spar carry through and for the rudder cable. Also it was glued to the plate for the static port. The picture of the right side of the fuselage shows the interior open for the last time until the right side skin is applied.
All of the fabric is shrunk with a domestic iron that has been calibrated at 250, 300, and 350F. The fabric is ironed twice or more at each temperature to slowly tighten it and remove any creases. The result is a smooth and taut surface ready for sealing and painting. The final picture shows the rather strange way in which rudder offset is created in the Wittman design to offset engine torque - this hadn't been obvious until the fabric was on. The VS main spar is perfectly upright and the top of the rudder is aligned exactly fore and aft, but the front spar is offset to the left at the bottom - you can see how it is out of line with the stringer which is centred. This creates the illusion that the whole VS is canted over which isn't the case.
Next job is obviously to close the right side and then it is on to finishing tapes over the seams and over the stringers. The fuselage itself in the design is a lifting body so the top surface will be under negative pressure in flight. To stop the top fabric ballooning off the frame it will be pop-riveted to the stringers.