30th August 2011 - Painting some of the interior

I want to final install the fuel tank and run the rudder cables before covering the fuselage so I needed to get the tank painted together with one section of the floor which the rudder cables run through. Today was dull but dry so it was an opportunity to get these done together with some other bits and pieces. The paint is a catalysed polyurethane which dries to a hard finish. As usual painting outside a selection of the local flies decided to embed themselves in the wet paint but hopefully these will polish out once the paint is fully dry.
Posted by Picasa

Monday, 29 August 2011

29th August 2011 - Left flap and aileron - all welding complete!

I think I have just completed the last welded joint on the airframe. This was the attachment of the small plate round the aileron hinge top surface to provide a flat surface to attach the fabric. This completed the left aileron and flap assembly which was constructed in a similar fashion to the right flap and aileron. This is another of those jobs that I have been putting off. The construction is not particularly difficult but does require a lot of cutting, fitting, melting and pouring lead, brazing and welding. The trailing edge which is folded stainless steel is brazed on and brazing always needs significant clean-up to remove any residual flux - another job I dislike. Now that the metalwork is complete I can take the last few pieces to be sandblasted ready for priming.


Posted by Picasa

7th June 2011 - Autopilot servo and aileron stops

The Trio autopilot servo was final installed with the linkage to the control column. This will provide wing levelling, course setting and GPS following. It is critical for servos that the linkage cannot go "over-centre" and get jammed so the wings were temporarily rigged to set the aileron travel and stops set up using Delrin rod mounted on 3/8" tubing stubs and secured using cotter pins and washers. With the correct aileron travel set the servo arm moves through an angle of about 45 degrees either side of the middle which should be adequate travel to provide plenty of control whilst being absolutely within safe limits. The top picture provides a good view of the way the cable routing works and keeps the cables out of the way of the controls. The bottom picture shows the Delrin bush within which the flap torque tube rotates.

31st May 2011 - Finishing the lift struts


The lift struts had been cut to length and the top tack welded when the wings were first fitted to the aircraft Fitting the lift struts
However, the top end needed to be final welded and a supporting rap of 0.071" steel sheet cut and bent to fit to provide additional strength. This was a fairly long and tricky bit of work that I had been putting off for some time. However, a satisfactory result was achieved and the struts were test fit to the wings to ensure that the shoulders of the struts fitted properly into the brackets bolted to the wingspar.
Then the hinges for the left aileron and flap were cut and welded. As with the right wing a fillet of braze metal was run into the acute angle of the hinge to ensure that the joint was robust. You can see in the hinges holes drilled in what will be the top of the hinge - these will be used for lubricating the hinge.
Posted by Picasa

12th March 2011 - Installing the stringers

The stringers provide support for the fabric covering of the fuselage and help create a curved shape. They are made from 1/2" aluminium tubing and are pop rivetted to the semicircular support tabs welded to the frame. This means that the outside of the tube that will support the fabric is completely smooth. There are three stringers along the top of the fuselage and two on the sides and bottom


Posted by Picasa

28th August 2011 - English Summer

I've had little chance to work on the Tailwind recently but hopefully will now be able to get going again. I have managed to get a bit done over the last few months so will post a few updates to catch up on progress. The weather forecast for today said sunny periods in the morning with light drizzle from 16:00 onwards. This was the scene at 11:00 in the morning! I had installed the left wing to start rigging the flap and aileron when the "light drizzle" started. With the help of my wife and next door neighbour we got the aircraft covered and 20 minutes later the rain had stopped so no damage done but having to work outside is a bit limiting


Posted by Picasa

Friday, 4 March 2011

4th March 2011 - Fitting the spinner

I'm waiting for some decent weather to do some painting so I took the opportunity to fit the spinner to the prop and prop extension. I had purchased a spun aluminium spinner "new old stock" intended for a Piper Cherokee 180. These are very expensive but I got this one at a good price. The problem was that the backplate and frontplate were cut out for a SAE #2 prop fitting and my engine is a SAE #1. I started by drilling a new set of SAE #1 spaced holes in the two plates using the CNC router. These were set 30 degrees out from the originals. Then the rivets holding the fillets underneath the propellor were drilled out and the fillets also moved 30 degrees, re-riveted and re-shaped to fit my propellor. The cut-outs in the spinner were also then shaped to fit and the spinner match drilled through the existing holes to the backplate. An additional 4 nutplates were riveted to the backplate and the spinner screwed to it. The existing holes were then used to match drill new holes in the spinner. This means there are now 8 screws holding the spinner to the backplate rather than the original four - should be stronger. Next the front plate was screwed in place in the spinner and the gap between the prop and the front plate measured. This was 8mm so a piece of 8mm aluminium plate was procured and a crush plate cut out on the router. A 1/8" aluminium spacer, the front plate, the crush plate the propellor and the backplate were then bolted to the prop extension and the spinner screwed into place. New holes were then drilled in the edge of the front plate through the existing holes in the spinner - again 30 degrees round from the originals. The original nutplates in the frontplate were then removed and re-riveted into their new positions. Finally the length of bolts needed to attach the propellor to the extension was accurately measured and AN bolts with drilled heads procured. These need to be exactly the correct length to ensure that the threads don't bottom but do show through the propellor lugs in the extension. The final job looks pretty good - a spun aluminium spinner for less than half the cost of the cheapest fibre-glass alternative. The only slight compromise is that the original cut-outs in the spinner were for the metal prop on the Cherokee and are about 1/4" too high leaving a slight gap above the front of the propellor. The sides and bottom are a perfect fit. I'll have a think about whether and how I could close these gaps for cosmetic purposes but they won't effect the performance in the air